JPS, LLP served as Geotechnical and Structural Engineer of Record for this 75,000 SF addition to Turning Stone Resort and Casino. This was a fast-track project in every sense, with total time from start of design to open lasting 10 months, including a complete redesign at month 3 and significant re-design at month 5. A project highlight is a sound isolation system installed between the piano bar and rock-and-roll venue directly below.