Most Holy Trinity Catholic Chapel, USMA West Point (c. 1900)

West Point, NY

Through on-site investigation, JPS, LLP discovered the brick masonry inner wythes of the tower walls had disintegrated and the tower roof and spire above were supported by the stone veneer and an interior steel frame.  Repair solution proposed shored the structure, deconstructed the tower walls (salvaging the stone for re-installation), and introducing a C.I.P. concrete frame for the wall structure.

Back to Projects ArrowBack to Projects